Night-shift build on the fair floor
Process · 16 days

From brief to dismantle,step by step.

Every stage has a date and an owner. Design in 48 hours, technical approval in five working days, build in eight hours.

Get a quote
From brief to dismantle

Six stages from idea to dismantling, one contract, one point of contact. Design, engineering, production, build and storage are all handled by our own team; the coordination between them stays with us, not with you.

  1. Day 0

    Brief & needs analysis

    Type of event, floor size, number of open sides, product list and budget range. We draw the outline of the project together in the first meeting.

    Design work over a fair floor plan

    Measurements first, drawing second.

  2. Day 2

    3D design & concept

    Three concepts matched to your brand identity and the architecture of the space, each with an itemised price. Two rounds of revisions included.

    3D visualisation of the stand

    Standing on screen before it stands on site.

  3. Day 4

    Technical drawings & approval

    Structural calculations, electrical and lighting plans, fire-retardancy certificates. We obtain the organiser's approvals ourselves.

    Congress stand, general view

    The paperwork is ours, and so is the responsibility.

  4. Day 14

    Production & dry assembly

    Production happens in our own workshop. Before anything leaves for site, every part is assembled, checked, numbered and photographed.

    Stand modules prepared in the workshop

    No surprises leave for site.

  5. Fair −1

    On-site build & handover

    A crew of six, eight hours. After the electrical and lighting tests we hand the space over ready to use.

    Build on the fair floor

    Standing the day before the fair.

  6. Fair +1

    Dismantling & logistics

    Dismantled in six hours. The modules are labelled, sent to storage and kept free of charge for twelve months, ready for your next project.

    Modules being prepared for storage

    The system goes up again at the next fair.

Our Process: From Brief to Dismantling | StandKur